Licensed general contractor. We handle design, permits, the water meter, and sewer in house.
Costs and rules change city by city. Pick yours for its real numbers, local permit notes, and video.
Choose your city
Orange County
Huntington Beach ADUs go through City of Huntington Beach Permit Center for plans and permits, City of Huntington Beach Utilities for water, and City of Huntington Beach Utilities for sewer. Coastal zone lots also need a Coastal Development Permit. State law now caps that review at 60 days.
Site visit, survey, floor plan, structural engineering, and Title 24 energy report.
We submit to the city and answer every correction. State law gives the city 60 days to approve or deny a complete ADU application.
Foundation to final inspection, with payments tied to passed city inspections.
We self perform the water service, meter, and sewer work that holds most ADU projects up.
Our civil engineering background means plans built to pass plan check, not just to submit.
We work directly with the city, water district, and sanitary district from start to finish.
California CSLB #1151239. Licensed and insured general contractor.
We look at your lot size, setbacks, and where the water, sewer, and power will run, then give you a realistic size and budget.