Orange County

Backyard ADUs in Huntington Beach

Licensed general contractor. We handle design, permits, the water meter, and sewer in house.

CSLB License #1151239 · Class A and B
Call or text

ADU video log by city

Costs and rules change city by city. Pick yours for its real numbers, local permit notes, and video.

Choose your city

ADUs in Huntington Beach

Orange County

Huntington Beach ADUs go through City of Huntington Beach Permit Center for plans and permits, City of Huntington Beach Utilities for water, and City of Huntington Beach Utilities for sewer. Coastal zone lots also need a Coastal Development Permit. State law now caps that review at 60 days.

Building an ADU in Huntington Beach: 3 things to know first
Nov 2026
9 to 14 months

From first visit to move in

  1. Step 1

    Design and survey

    1 to 2 months

    Site visit, survey, floor plan, structural engineering, and Title 24 energy report.

  2. Step 2

    Plan check

    2 to 4 months

    We submit to the city and answer every correction. State law gives the city 60 days to approve or deny a complete ADU application.

  3. Step 3

    Build

    5 to 8 months

    Foundation to final inspection, with payments tied to passed city inspections.

Why build with us

Utilities in house

We self perform the water service, meter, and sewer work that holds most ADU projects up.

Plans drafted in house

Our civil engineering background means plans built to pass plan check, not just to submit.

Permits handled

We work directly with the city, water district, and sanitary district from start to finish.

Licensed Class A and B

California CSLB #1151239. Licensed and insured general contractor.

Get a free ADU lot check

We look at your lot size, setbacks, and where the water, sewer, and power will run, then give you a realistic size and budget.

Call