Orange County

Backyard ADUs in Fullerton

Licensed general contractor. We handle design, permits, the water meter, and sewer in house.

CSLB License #1151239 · Class A and B
Call or text

ADU video log by city

Costs and rules change city by city. Pick yours for its real numbers, local permit notes, and video.

Choose your city

ADUs in Fullerton

Orange County

Fullerton ADUs go through City of Fullerton Building and Safety for plans and permits, City of Fullerton Water Division for water, and City of Fullerton Sewer Division for sewer. Fullerton takes building permits online through its EasyDev portal.

Building an ADU in Fullerton: 3 things to know first
Nov 2026
9 to 14 months

From first visit to move in

  1. Step 1

    Design and survey

    1 to 2 months

    Site visit, survey, floor plan, structural engineering, and Title 24 energy report.

  2. Step 2

    Plan check

    2 to 4 months

    We submit to the city and answer every correction. State law gives the city 60 days to approve or deny a complete ADU application.

  3. Step 3

    Build

    5 to 8 months

    Foundation to final inspection, with payments tied to passed city inspections.

Why build with us

Utilities in house

We self perform the water service, meter, and sewer work that holds most ADU projects up.

Plans drafted in house

Our civil engineering background means plans built to pass plan check, not just to submit.

Permits handled

We work directly with the city, water district, and sanitary district from start to finish.

Licensed Class A and B

California CSLB #1151239. Licensed and insured general contractor.

Get a free ADU lot check

We look at your lot size, setbacks, and where the water, sewer, and power will run, then give you a realistic size and budget.

Call