Licensed general contractor. We handle design, permits, the water meter, and sewer in house.
Costs and rules change city by city. Pick yours for its real numbers, local permit notes, and video.
Choose your city
Orange County
Costa Mesa ADUs go through the city for plan check, Mesa Water District for the meter, and Costa Mesa Sanitary District for sewer.
800 SF detached ADU, 2 bed and 1 bath
Planning estimate, October 2026. Fees are based on current Costa Mesa, Mesa Water, Costa Mesa Sanitary District, school district, and SCE schedules and change over time. Your lot, size, and finishes will change the number.
Costa Mesa only charges its city impact fee on ADUs of 750 SF and up. Building at 749 SF instead of 800 SF saves about $6,786.
Site visit, survey, floor plan, structural engineering, and Title 24 energy report.
We submit to the city and answer every correction. State law gives the city 60 days to approve or deny a complete ADU application.
Foundation to final inspection, with payments tied to passed city inspections.
We self perform the water service, meter, and sewer work that holds most ADU projects up.
Our civil engineering background means plans built to pass plan check, not just to submit.
We work directly with the city, water district, and sanitary district from start to finish.
California CSLB #1151239. Licensed and insured general contractor.
We look at your lot size, setbacks, and where the water, sewer, and power will run, then give you a realistic size and budget.